Product Detail :
|
Improvement of black spot on NMT road (NH 503 extn) to takarla km 0/0 to 3/0. Construction of retaining wall with filling, parapets and M/T km 0/0 to 0/150. Construction of link road to village kharyali km 0/0 to 4/0. Construction of protection wall with wire crates along with embankment between RD 2/100 to 3/500 under SCCP. Construction of link road harijan basti bhanjal km 0/0 to 4/0. Providing and laying GSB, metalling tarring between km 3/150 to 4/0. Construction of link road gra, panchayat nangal jarialan harijan basti km 0/0 to 2/0. Providing and laying 900 mm dia hume pipe culvert at RD 1/500, 6.00 mtr, RCC slab culvert at RD 1/900 and GSB, metalling tarring km 1/500 to 2/0 under SCCP. Construction of and Maintenance testing link road harijan basti amboa km 0/0 to 2/0. Providing and laying interlocking paver block between km 0/0 to 0/600 and GSB, metalling tarring between km 0/600 to 1/0 under SCCP. Missing CD on link road harijan basti dangoh km 0/0 to 1/0. Construction of 6.00 RCC slab culvert at RD 0/075. Missing CD on link road bhaderkali to bajigar mohalla km 0/0 to 1/700. Construction of solid causeway at RD 1/260 to 1/295. Construction of and maintenance / testing link road harijan basti chatehar buhal km 0/0 to 1/704. Construction of solid causeway at RD 1/635 to 1/704. Construction of nine rooms at government senior secondary school jawar tehsil amb. Construction of three class rooms under SCCP. Construction of missing CD on link road jawar maslana rajpura road km 0/0 to 6/500. Construction of 900 mm dia RCC hume pipe culvert at RD 1/540, 2/180 and 2/340 and construction of retaining wall at RD 3/350 to 3/395.
|